CIVIL ENGINEERS !! GET 100% PRACTICAL TRAINING IN QUANTITY SURVEY , ESTIMATION AND COSITNG , RATE ANALYSIS , BAR BENDING SCHEDULE , BILLING, TENDERING, CONTRACTS MANAGEMENT AND CONSTRUCTION PROJECTS
MANAGEMENT (CPM)
CALL US AT +91-9990990844 / WHATSAPP US AT +918603333379
AN OLDEST AND TRUSTED BRAND IN QUANTITY SURVEYING IN INDIA FOR CIVIL MECHANICAL ELECTRICAL ENGINEERS AND CONSTRUCTION PROFESSIONALS
BHADANIS- REGISTERED Under Govt. of INDIA | ISO CERTIFIED | CIOB TRAINING PARTNER
BHADANI'S ~ A BRAND THAT EVERY CIVIL ENGINEER TRUST !!
A LIFE LINE FOR EVERY CIVIL ENGINEER !!
BHADANIS LEVEL 1 TO LEVEL 5 COURSE FOR CIVIL ENGINEERS & CONSTRUCTION PROFESSIONALS
Quantity Surveying & Estimation and Costing ,QA and QC
Level 1 - Duration :- 30 Days
-
Understanding the Role of BHADANI'S Construction Management Training and Role of Construction Managers in the Construction Industry
-
Artificial Intelligence Introduction (**New**)
-
Quality Control and Quality Assurance Techniques used (Basics)
-
Construction Methodologies of Civil Works and How it works in Construction Industry
-
Construction Activities Identification Analysis and Report Generation
-
Making Project Chartered and Feasible Reports
-
Project Risk Analysis and Action Reports
-
Understanding and Reading the Structural and Architectural Drawings
-
Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
-
Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
-
Faster Take off Methodologies from Drawings of Civil
-
Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
-
Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
-
Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
-
Estimation Technique During Design Phase
-
Estimation Technique During Pre-Construction Phase
-
Estimation Technique During Post-Construction Phase
-
Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
-
Pre-Engineered Building (PEB) Estimation
-
Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
-
Costing Techniques- Risk Based Costing
-
Costing Techniques - Parametric Costing
-
Costing Techniques - Machinery Transport Management and Costing
-
Costing Techniques - Scope Estimation and Cost Analysis
-
Costing Techniques - Artificial Intelligence (**New**)
-
Costing Techniques - Consulting Part and Software Usage Part for the Construction Project
-
S-Curve Reporting
-
Labour Deployment Planning As per Budget
-
Labour Economics and Productivity Analysis
-
Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
-
Economic Order Quantity (EOQ) and Management
-
Machinery Output Analysis as per Market Standards
-
Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
-
Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
-
Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
-
Bill of Quantity (BOQ) Take off (Material and Preparation)
-
Rate Analysis of All Kinds of Civil Works
-
Material Reconciliation Techniques from Contractor and Client's Side
-
Material Procurement Strategies as per the techniques used in Quantity Surveying
-
FREE LANCE Quantity Surveying with Hands on Practice
After Completing Level 1 ~ You can Apply for the Position of Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Billing Engineering
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
Level 2 Duration :- 15 Days
-
Understanding the Role of BHADANI'S Billing Engineer / Invoice Engineering in the Construction Management and Industry of India and World
-
Billing Engineering Tasks at Site Office and Understanding the Role in Head office with the Client Coordiation
-
Account Basics requirement for Billing Engineer
-
Construction Billing Procedures From Client Side as well as Contractor Side
-
Interim Payment Certification (IPC) from Client Sides as well as Contractor Side
-
RA Bill Making - Client Billing - Subcontracting
-
Billing with GST and Without GST - hands of Expertise
-
CPWD and Corporations and PSU's Techniques of Billing
-
Invoice Generation Through ERP
-
Claim and Dispute Settlement Procedures and all required techniques in Billing and MIS Generation for the same
-
Material Engineering Bills for Both Client Side as well as Contractor's Side
-
Third Party Contractor Billing
-
Joint Venture Companies / Contractor Billing
-
Petty/ Vendor Billing
-
Preliminary Billing - Post Construction Billing
-
InterAlia Billing , International Billing Challan Generation
-
Claim Management Procedures used by Invoice Engineers
-
Claim of Price Variations as per Norms of Govt. of INDIA
-
Claim of Quantity Variations as per the Norms of Govt. of INDIA
-
Mode of Measurement as per IS Codes with Nomenclatures
-
Claim of Extra Item Analysis of All Kinds of Civil Works During the Site Execution as well as Post Contracting Period
-
Vendor Vs. Client Bill Reconciliation
After Completing Level 1 and 2 ~ You can Apply for the Position of Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Tendering and Construction Contracts Management (Contract Engineering)
LEVEL 3 & 4:- DURATION :- 30 DAYS
-
Tendering Documents Preparation
-
Tendering Documents Submission Guidelines
-
Tender Review Reports Generation (T.R.R) for the Contractors as well as Consultants
-
Technical Bidding As per Government Laws and as per BHADANI'S Technique
-
Financial Bidding As per Government Laws and as per BHADANI'S Technique
-
Statutory Documents Preparation Techniques for the Tender
-
Purchasing and Negotiation Techniques used by Clients and as well as Contractor's Side
-
Pre-Bid Meeting Strategy Building and Coordination with Client
-
Finding Deviations and Clarify with the Client
-
Tender Hunting
-
Reverse Auctioning Strategy Building and Pressurizing client for the tender
-
Pooling Technique to use effectively for the Tender to get Maximize Benefits
-
Evaluation Strategy - Bidding Strategy - Relationship Building
-
Indemnify the Tender with the Use of Effective Monitoring of the Tender
-
Entering Into Contracts - Strategy Building Approach - Scientific Approach
-
Construction Contracts Documents Formulation and Preparation
-
Procedures in Contract Management - Pre - Construction and Post Construction Phase
-
Clearing , Forwarding and Transport
-
Transport Management
-
Interpretation of Contracts and Contract Terms
-
Cost Overrun and Time Overrun - Strategy Building Approach
-
Indian Laws for Construction Contract Management
-
FIDIC International Laws (EPC Turnkey Projects)
-
Work Order Preparation ( Like Alstom Siemens Etc.)
-
Live Project Training for Procurement and Negotiation Techniques
After Completing Level 1 to 4 ~ You can Apply for the Position of Tendering Engineer, Contracts Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
PROJECTS MANAGEMENT AND PLANNING ENGINEERING
-
Critical Thinking and Problem Solving Approach
-
Strategical Thinking and Risk Analysis
-
Project Planning - Master Plan Generation
-
Project Management Procedures Used for Construction Industry by Big MNC's and Construction Companies of India and World
-
Role of Project Manager in Construction Industry
-
Project Budget Preparation with all factors analysis in Hand
-
Actual Situation Comparison with Budget Amount
-
Progress Monitoring with the Key Indicators Strategy
-
MS Project - Scheduling and Primavera P6 Software
-
Project Coordination Techniques with Accounts , HR , Purchase and Procurement Departments with easy solutions
-
Management Information Generation
-
Modern Building Construction Trends Execution Plan & Strategy Building
-
Resettlement and Rehabilitation (R&R) for speedy progress of work
-
Quality Assurance with Total Quality Control Planning
-
Site (Field) Management Techniques used by Project Managers at Site
-
Management of Emergencies in High Rise Buildings
-
Self Inspection for Quality Construction at Site
-
Cost and Time Controlling Strategies used for Construction Projects
-
Cash Flow Monitoring - Budget Vs Actual Comparison
-
Green Sheet Report - Profit and Loss Determination for Construction Projects
-
SWOT Analysis for Construction Project
-
JIT Implementation in any Construction Project
-
Earned Value Management (EVM) in Construction Project
After Completing Level 1 to Level 5 ~ You can Apply for the Position of Planning Engineer, Project Manager, General Manager, Incharge, Tendering Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Top of Form
Civil Engineer , Fill the below form to get Course Brochure in your Mail ~ Don't Waste time , This is Career Booster Training and Fully Market Designed Training? Just Fill this Form to get all your Doubts Clear or Call or Whatsapp us at +919990990844
+918603333379
Syllabus | Duration | Location | Fees | Reviews | Review
How do estimation and costing work in House Constructions?
Calculating or evaluating a quantity based solely on assumptions—that is, without using precise measurements—is the process of estimation. In the field of civil engineering, as well as other engineering disciplines, estimating is a fundamental process.
This is typically carried out in the early stages of planning, prior to the start of the purchase or construction process. Estimating is typically more accurate, but it has some drawbacks. For example, if your estimate depends on labour costs, you'll need to know how many man-hours it will take to finish the project.
Estimates are created using knowledge of past experience and observations. The level of detail available and the length of time that data are accessible for analysis are factors that frequently affect how accurate an estimate is.
Costing is the process of determining an unfinished project's cost. An itemised list or an estimation using a construction cost calculator can be used.
Estimating, bidding, and finalising are the three steps in the costing process. It assists in estimating the amount of funding needed to complete the project.
A "costing" is typically used to describe the price that will be incurred to produce one unit of something, in this case most likely construction work.
There are two categories of costs:
Independent costing refers to the price of raw materials and labour. This method of costing, which only considers the cost of a single phase, is not indicative of the project's total cost.
Cumulative Costing: It can be challenging to ensure that estimates are accurate when looking at the total cost for all work phases.
The construction industry has specific roles and responsibilities for quantity surveyors and estimators.
A quantity surveyor may work on the construction site or in an office for the client, the contractor, or a subcontractor. They get involved in a project right away by assisting in the creation of budgets and cost estimates for the work.
Quantity surveyors are in charge of keeping an eye on any contract changes that might have an impact on costs and creating reports that show the project's profitability while the work is still being done.
He or she will perform the duties of both a project engineer and a quantity surveyor. He or she will be in charge of managing the project, following construction protocols, coordinating all work schedules with the principal contractor, and corresponding with the project manager and the architectural coordinator.
He or she is in charge of overseeing and making sure that the work is progressing within the confines of the project schedules, in addition to independently managing the project and motivating and leading the team.
Quantity estimation and the production of BOQ and BBS documents in accordance with drawings
• Working in concert with the Design and Construction team.
• Look over the engineering drawings and specifications, verify that the details have been accurately translated to the ground, and confirm that all centering and reinforcement work has been finished.
• The actual quantification of quantities and the tracking of productivity levels.
• Ensuring that the resources are available when needed.
• Conducting a cost analysis for alterations and repairs that the customer handled within the parameters of the project.
• Making financial arrangements and conducting an evaluation of the completed work.
• Ascertain the structure's high quality, that the work was completed in accordance with the drawings and specifications, and that no rework was required.
• Carrying out in-depth analyses of the outcomes and creating thorough status reports
• Making daily, weekly, and monthly reports and submitting them to management.
A QS may perform a number of tasks related to the construction industry. The following list includes a few that are related to the construction site.
Calculating the estimated material quantities A QS will calculate the required quantities of materials, such as cement, sand, aggregates, steel, bricks, blocks, tiles, paint, etc., based on the measurements of the drawings.
Contracts for Procurement The QS of a client will release tenders and RFQs, hold negotiations, finalise contracts, issue work orders and agreements, and so forth. The contractor's quantity surveyor (QS) will estimate the quantities and conduct a rate analysis in order to prepare a tender.
The client's quality assurance representative is responsible for reviewing the contractor's monthly invoices, and the contractor's quality assurance representative is responsible for creating the monthly invoices based on the work that was completed on the job site.
In order to reconcile materials, the QS must first prepare a reconciliation statement based on the quantity of materials received, the quantity of materials used, and the remaining amount on site. The QS must then determine the amount of material that was wasted.
Reports will be created, including cash flow reports, progress reports, monthly cost reports, and other types of reports as required by the QS.