CIVIL ENGINEERS !! GET 100% PRACTICAL TRAINING IN QUANTITY SURVEY , ESTIMATION AND COSITNG , RATE ANALYSIS , BAR BENDING SCHEDULE , BILLING, TENDERING, CONTRACTS MANAGEMENT AND CONSTRUCTION PROJECTS
MANAGEMENT (CPM)
CALL US AT +91-9990990844 / WHATSAPP US AT +918603333379
AN OLDEST AND TRUSTED BRAND IN QUANTITY SURVEYING IN INDIA FOR CIVIL MECHANICAL ELECTRICAL ENGINEERS AND CONSTRUCTION PROFESSIONALS
BHADANIS- REGISTERED Under Govt. of INDIA | ISO CERTIFIED | CIOB TRAINING PARTNER
BHADANI'S ~ A BRAND THAT EVERY CIVIL ENGINEER TRUST !!
A LIFE LINE FOR EVERY CIVIL ENGINEER !!
BHADANIS LEVEL 1 TO LEVEL 5 COURSE FOR CIVIL ENGINEERS & CONSTRUCTION PROFESSIONALS
Quantity Surveying & Estimation and Costing ,QA and QC
Level 1 - Duration :- 30 Days
-
Understanding the Role of BHADANI'S Construction Management Training and Role of Construction Managers in the Construction Industry
-
Artificial Intelligence Introduction (**New**)
-
Quality Control and Quality Assurance Techniques used (Basics)
-
Construction Methodologies of Civil Works and How it works in Construction Industry
-
Construction Activities Identification Analysis and Report Generation
-
Making Project Chartered and Feasible Reports
-
Project Risk Analysis and Action Reports
-
Understanding and Reading the Structural and Architectural Drawings
-
Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
-
Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
-
Faster Take off Methodologies from Drawings of Civil
-
Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
-
Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
-
Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
-
Estimation Technique During Design Phase
-
Estimation Technique During Pre-Construction Phase
-
Estimation Technique During Post-Construction Phase
-
Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
-
Pre-Engineered Building (PEB) Estimation
-
Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
-
Costing Techniques- Risk Based Costing
-
Costing Techniques - Parametric Costing
-
Costing Techniques - Machinery Transport Management and Costing
-
Costing Techniques - Scope Estimation and Cost Analysis
-
Costing Techniques - Artificial Intelligence (**New**)
-
Costing Techniques - Consulting Part and Software Usage Part for the Construction Project
-
S-Curve Reporting
-
Labour Deployment Planning As per Budget
-
Labour Economics and Productivity Analysis
-
Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
-
Economic Order Quantity (EOQ) and Management
-
Machinery Output Analysis as per Market Standards
-
Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
-
Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
-
Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
-
Bill of Quantity (BOQ) Take off (Material and Preparation)
-
Rate Analysis of All Kinds of Civil Works
-
Material Reconciliation Techniques from Contractor and Client's Side
-
Material Procurement Strategies as per the techniques used in Quantity Surveying
-
FREE LANCE Quantity Surveying with Hands on Practice
After Completing Level 1 ~ You can Apply for the Position of Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Billing Engineering
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
Level 2 Duration :- 15 Days
-
Understanding the Role of BHADANI'S Billing Engineer / Invoice Engineering in the Construction Management and Industry of India and World
-
Billing Engineering Tasks at Site Office and Understanding the Role in Head office with the Client Coordiation
-
Account Basics requirement for Billing Engineer
-
Construction Billing Procedures From Client Side as well as Contractor Side
-
Interim Payment Certification (IPC) from Client Sides as well as Contractor Side
-
RA Bill Making - Client Billing - Subcontracting
-
Billing with GST and Without GST - hands of Expertise
-
CPWD and Corporations and PSU's Techniques of Billing
-
Invoice Generation Through ERP
-
Claim and Dispute Settlement Procedures and all required techniques in Billing and MIS Generation for the same
-
Material Engineering Bills for Both Client Side as well as Contractor's Side
-
Third Party Contractor Billing
-
Joint Venture Companies / Contractor Billing
-
Petty/ Vendor Billing
-
Preliminary Billing - Post Construction Billing
-
InterAlia Billing , International Billing Challan Generation
-
Claim Management Procedures used by Invoice Engineers
-
Claim of Price Variations as per Norms of Govt. of INDIA
-
Claim of Quantity Variations as per the Norms of Govt. of INDIA
-
Mode of Measurement as per IS Codes with Nomenclatures
-
Claim of Extra Item Analysis of All Kinds of Civil Works During the Site Execution as well as Post Contracting Period
-
Vendor Vs. Client Bill Reconciliation
After Completing Level 1 and 2 ~ You can Apply for the Position of Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Tendering and Construction Contracts Management (Contract Engineering)
LEVEL 3 & 4:- DURATION :- 30 DAYS
-
Tendering Documents Preparation
-
Tendering Documents Submission Guidelines
-
Tender Review Reports Generation (T.R.R) for the Contractors as well as Consultants
-
Technical Bidding As per Government Laws and as per BHADANI'S Technique
-
Financial Bidding As per Government Laws and as per BHADANI'S Technique
-
Statutory Documents Preparation Techniques for the Tender
-
Purchasing and Negotiation Techniques used by Clients and as well as Contractor's Side
-
Pre-Bid Meeting Strategy Building and Coordination with Client
-
Finding Deviations and Clarify with the Client
-
Tender Hunting
-
Reverse Auctioning Strategy Building and Pressurizing client for the tender
-
Pooling Technique to use effectively for the Tender to get Maximize Benefits
-
Evaluation Strategy - Bidding Strategy - Relationship Building
-
Indemnify the Tender with the Use of Effective Monitoring of the Tender
-
Entering Into Contracts - Strategy Building Approach - Scientific Approach
-
Construction Contracts Documents Formulation and Preparation
-
Procedures in Contract Management - Pre - Construction and Post Construction Phase
-
Clearing , Forwarding and Transport
-
Transport Management
-
Interpretation of Contracts and Contract Terms
-
Cost Overrun and Time Overrun - Strategy Building Approach
-
Indian Laws for Construction Contract Management
-
FIDIC International Laws (EPC Turnkey Projects)
-
Work Order Preparation ( Like Alstom Siemens Etc.)
-
Live Project Training for Procurement and Negotiation Techniques
After Completing Level 1 to 4 ~ You can Apply for the Position of Tendering Engineer, Contracts Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
PROJECTS MANAGEMENT AND PLANNING ENGINEERING
-
Critical Thinking and Problem Solving Approach
-
Strategical Thinking and Risk Analysis
-
Project Planning - Master Plan Generation
-
Project Management Procedures Used for Construction Industry by Big MNC's and Construction Companies of India and World
-
Role of Project Manager in Construction Industry
-
Project Budget Preparation with all factors analysis in Hand
-
Actual Situation Comparison with Budget Amount
-
Progress Monitoring with the Key Indicators Strategy
-
MS Project - Scheduling and Primavera P6 Software
-
Project Coordination Techniques with Accounts , HR , Purchase and Procurement Departments with easy solutions
-
Management Information Generation
-
Modern Building Construction Trends Execution Plan & Strategy Building
-
Resettlement and Rehabilitation (R&R) for speedy progress of work
-
Quality Assurance with Total Quality Control Planning
-
Site (Field) Management Techniques used by Project Managers at Site
-
Management of Emergencies in High Rise Buildings
-
Self Inspection for Quality Construction at Site
-
Cost and Time Controlling Strategies used for Construction Projects
-
Cash Flow Monitoring - Budget Vs Actual Comparison
-
Green Sheet Report - Profit and Loss Determination for Construction Projects
-
SWOT Analysis for Construction Project
-
JIT Implementation in any Construction Project
-
Earned Value Management (EVM) in Construction Project
After Completing Level 1 to Level 5 ~ You can Apply for the Position of Planning Engineer, Project Manager, General Manager, Incharge, Tendering Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Top of Form
Civil Engineer , Fill the below form to get Course Brochure in your Mail ~ Don't Waste time , This is Career Booster Training and Fully Market Designed Training? Just Fill this Form to get all your Doubts Clear or Call or Whatsapp us at +919990990844
+918603333379
Syllabus | Duration | Location | Fees | Reviews | Review
Within the construction industry, quantity surveyors and estimators have specific roles to play.
A quantity surveyor may work for the client, the contractor, or a subcontractor, and their place of employment may be an office or the actual construction site. They get involved in a project right away, assisting with the creation of work budgets and cost estimates.
While the project is still being worked on, quantity surveyors are in charge of keeping an eye on any contract changes that might have an impact on costs and producing reports that show the project is profitable.
He or she will perform the duties of a project engineer in addition to those of a quantity surveyor. In this capacity, he or she will be in charge of overseeing the project, following construction protocols, coordinating all work schedules with the principal contractor, and corresponding with the project manager and the architectural coordinator.
He or she is in charge of overseeing and ensuring that the work is progressing within the confines of the project schedules in addition to independently managing the project and motivating and leading the team.
Quantity estimation and the development of BOQ and BBS documents in accordance with drawings
• Coordinating with the Design and Construction team.
• Examine the engineering drawings and specifications, confirm that the details of the drawings have been accurately translated to the ground, and confirm that all centering and reinforcement works have been finished.
• The actual measurement of quantities as well as the observation of productivity levels.
• Ensuring that the resources are available in a timely manner.
• Conducting a cost analysis for alterations and repairs that the customer performed that fell under the project's purview.
• Making financial arrangements and conducting a review of the completed work.
• Ensure that the structure is of a high calibre, that the work is completed in accordance with the drawings and the specifications, and that no rework is required.
• Analyzing data in-depth and creating thorough status reports
• Creating daily, weekly, and monthly reports and submitting them to management
A QS may perform a number of jobs within the construction industry. Below are a few that are related to the construction site.
estimation of material quantities A QS will measure the drawings and determine how much cement, sand, aggregate, steel, brick, block, tile, paint, etc. must be purchased.
Contracts for Procurement - The QS of a Client will publish Tenders/RFQs, hold negotiations, finalise contracts, publish work orders/agreements, and so forth. The Quantity Surveyor (QS) for the Contractor will estimate the quantities and conduct a rate analysis prior to submitting a tender.
Monthly bill checking entails the Quality Assurance representative of the client reviewing the monthly invoices submitted by the contractor and the Quality Assurance representative of the contractor preparing the monthly invoices based on the work that was completed on the job site.
Material reconciliation calls for the QS to create a Reconciliation statement based on the quantity of materials received, the quantity of materials used, the balance on site, and the amount of material that was wasted.
Reports will be created, including monthly Cost reports, Progress reports, Cashflow reports, and other types of reports as required by the QS.